President Water
STRUCTURED WATER FOR

Education & Sports Fields

For schools, universities & education sports grounds

Championship-quality grounds and active research partnerships — on tighter budgets. Safer surfaces, lower irrigation, and curriculum-ready sustainability outcomes.

HERO · IMAGE
Education & Sports Fields
Safer
Playing surfaces, fewer injuries
Less
Irrigation & maintenance overhead
Curtin
Bought more units after results
Active
Forrestdale Primary trial

Key Benefits

Safer playing surfaces

Healthier, more resilient turf means safer surfaces for users and fewer injuries.

Performance on tighter budgets

School ovals and sports fields perform better with reduced irrigation and maintenance overhead.

Proven under restrictions

Curtin University maintained superior turf under Watercorp restrictions — and purchased additional units based on results.

Curriculum & sustainability

Supports institutional sustainability goals and curriculum integration. Forrestdale Primary School active installation under trial.

ROI EXAMPLE

See what the numbers look like.

Based on typical results. Your actual savings may vary.

ItemBeforeAfterSavings
Watering (Curtin, summer)Increase neededHeld flat2-day-per-week cap met
Curtin University outcomeExpanded the rollout

Case Studies

Curtin University — Midland Campus — No summer watering increase

Curtin University — Midland Campus

No summer watering increase

Waterwise university held to 2-day-per-week watering. Healthier turf through a 38°C summer with no extra irrigation — they bought more units.

Technical Specifications

  • Inline installation — fits existing mains, no infrastructure change
  • No electricity, no moving parts, no consumables
  • 316L marine-grade stainless steel construction
  • 10-year performance warranty on all commercial units
  • Compatible with bore, scheme, dam, reclaimed and mains water

Implementation Process

  1. 01

    Site Assessment

    We review your water source, infrastructure, soil conditions, and the outcomes you need.

  2. 02

    Specification

    We match the right line size and model (¾" to 12") to your flow rate and system.

  3. 03

    Inline Installation

    Units install inline on your existing mainline — typically completed in one visit.

  4. 04

    Measure & Verify

    We help set up metered before/after measurement so the savings are documented, not estimated.

Ready to see results?

Get a free site assessment and learn how structured water can deliver ROI for your operation.

Looking for our Home, Health & Garden solutions?Visit presidentwater.co