Municipal & Councils
For councils, shires & municipal water managers
Councils face mounting pressure from regulators, ratepayers, and sustainability mandates — while managing ageing infrastructure and tightening budgets. President Water delivers metered, documented results that hold up to public scrutiny.
Key Benefits
Compliance-ready documentation
Independently metered and verified water savings — defensible for council procurement, ESG reporting, and public accountability.
Rapid, measurable ROI
City of Armadale: 121% Year 1 ROI with 9.9-month payback — fully auditable for council finance committees.
Proven at Gwynne Park
NDVI satellite imaging confirmed zero dead patches post-installation. Water licence restored from 134% over-limit to within compliance.
Sustainability leadership
Demonstrates responsible, visible water stewardship to ratepayers, state government, and community stakeholders.
Zero maintenance burden
No power, no moving parts, no servicing — no additional burden on parks and recreation staff.
Compatible with existing systems
Installs inline on existing infrastructure — no major capital works required across parks, ovals, and public gardens.
See what the numbers look like.
Based on typical results. Your actual savings may vary.
| Item | Before | After | Savings |
|---|---|---|---|
| Water (Gwynne Park, kL) | 85,822 | 71,983 | 13,839 kL |
| Fertiliser | 5,875 kg | 2,350 kg | 3,525 kg (60%) |
| Pump Energy | — | — | 8,564 kWh |
| Verified annual savings (City of Armadale) | $16,933 | ||
Case Studies

City of Armadale — Gwynne Park
4.7 ha sporting precinct on 1974-era infrastructure. 13,839 kL saved, 60% less fertiliser, 9.9-month payback, 121% Year 1 ROI.
City of Cockburn
Active installation across public facilities. Reduced irrigation demand while maintaining public green space presentation and meeting Water Corporation requirements.
Technical Specifications
- Inline installation — fits existing mains, no infrastructure change
- No electricity, no moving parts, no consumables
- 316L marine-grade stainless steel construction
- 10-year performance warranty on all commercial units
- Compatible with bore, scheme, dam, reclaimed and mains water
Implementation Process
- 01
Site Assessment
We review your water source, infrastructure, soil conditions, and the outcomes you need.
- 02
Specification
We match the right line size and model (¾" to 12") to your flow rate and system.
- 03
Inline Installation
Units install inline on your existing mainline — typically completed in one visit.
- 04
Measure & Verify
We help set up metered before/after measurement so the savings are documented, not estimated.
Ready to see results?
Get a free site assessment and learn how structured water can deliver ROI for your operation.
